Boiler
Pipes
Wires
Outlet
Doors 2-3
Step ladder
Ladder to “Attic”
Stairs
Grate
Railing
Lights
Storage rack
Fan
Vent
Drain
Toolbox
Wrench
Hammer
Screwdriver
Hose
Valves
Exit sign?
Garbage
Floor, Wall, Ceiling
Paint buckets
Breaker box
That's the main list that I wanted to post. Hopefully I'll be able to complete all of them within the time I allowed. I'm basically giving myself three weeks to model, three weeks to texture, two weeks to light, and the final two weeks to polish everything up.